Typical projects close in 10–14 days; fast-track to 7 when gear is in stock and approvals are clear. Racking, OS/hypervisor, SAN/NAS, backups, and full handover docs by OEM-certified engineers.
We handle the messy middle: power and network planning, racking, firmware, hypervisor/OS install, storage zoning, backups, monitoring, and full runbooks. You get a production-ready environment with documentation and a clean handover.
Pick the pieces you need, or hand us the full stack. We work in tight change windows with rollback plans.
Rack & stack, power budgeting, switch uplinks, VLANs, iDRAC/iLO access, labeling, and asset documentation.
Firmware, RAID, and hypervisor/OS install (VMware, Hyper-V, Proxmox, Windows, Linux) with security hardening and patching.
SAN/NAS zoning, LUN provisioning, snapshots, backup jobs, replication tests, and documented recovery runbooks.
A short, repeatable path from scope to go-live.
Inventory, target state, risk/rollback, and BoM. Free scoping call with a solution architect.
Racking, cabling, firmware, OS/hypervisor, storage zoning, backup jobs, and monitoring hooks.
Change-window execution, validation, rollback ready. Handover docs: IPs, creds, runbooks, diagrams.