Need Your Servers Live Fast? As Quick as 7 Days.

Typical projects close in 10–14 days; fast-track to 7 when gear is in stock and approvals are clear. Racking, OS/hypervisor, SAN/NAS, backups, and full handover docs by OEM-certified engineers.

TechLeaf engineers fast-tracking server and storage deployment
Zero-Downtime Cutovers Planned windows with rollback and validation checklists

From Rack & Stack to Live Production.

We handle the messy middle: power and network planning, racking, firmware, hypervisor/OS install, storage zoning, backups, monitoring, and full runbooks. You get a production-ready environment with documentation and a clean handover.

Dell · HP · Lenovo · IBM VMware · Hyper-V · Proxmox SAN/NAS · Backup · DR Change window playbooks

Scope We Typically Own

Pick the pieces you need, or hand us the full stack. We work in tight change windows with rollback plans.

Rack, Power, Network

Rack & stack, power budgeting, switch uplinks, VLANs, iDRAC/iLO access, labeling, and asset documentation.

OS & Virtualization

Firmware, RAID, and hypervisor/OS install (VMware, Hyper-V, Proxmox, Windows, Linux) with security hardening and patching.

Storage, Backup, DR

SAN/NAS zoning, LUN provisioning, snapshots, backup jobs, replication tests, and documented recovery runbooks.

Fast, Documented, Predictable

A short, repeatable path from scope to go-live.

1

Scope & Design (48h)

Inventory, target state, risk/rollback, and BoM. Free scoping call with a solution architect.

2

Build & Configure

Racking, cabling, firmware, OS/hypervisor, storage zoning, backup jobs, and monitoring hooks.

3

Cutover & Handover

Change-window execution, validation, rollback ready. Handover docs: IPs, creds, runbooks, diagrams.

Most builds land in 10–14 days with full documentation.

In-stock hardware, clear scope, and approved windows let us hit 7 days. Otherwise, expect 10–14 days with change plans, validation, and handover docs.